From contract to closeout: a week-by-week look at a typical build
What actually happens between signing a contract and getting your keys back — mobilization, milestones, and the closeout paperwork most owners never see.
Clients often ask what actually happens between signing a contract and getting the keys back. Here's the shape of a typical project, start to finish.
The first two weeks: mobilization
Permits are pulled, insurance and site logistics are confirmed, and the crew, dumpster, and protection go up before a single wall comes down.
The build: milestone by milestone
Demolition, structural and systems rough-in, inspections, then finishes — each phase is scheduled against the next so trades aren't waiting on each other, and each is signed off before it's covered.
Closeout: the part no one sees coming
Final inspections, a certificate of occupancy or completion where required, punch-list walkthroughs, and warranty documentation — closeout is real work, and we build time for it into the schedule instead of treating it as an afterthought.
Have a project in mind?
We'll talk through the design, permit, and construction path — no obligation.
Start the conversationKeep reading
Ready to build with confidence?
Tell us about your project — design, permits, or a full build. We'll get back to you within one business day.
- Free, no-obligation consultation
- Licensed, bonded & fully insured
- Design, permits & build in one team
- Clear timeline and itemized budget
Prefer to reach us directly?
No call centers — you'll talk to the team that runs the build.
- Call+1 929 741 0550
- Emailinfo@maha-construction.us
- Visit169-20 Hillside Avenue, 2nd Floor, Suite 3, Jamaica, NY 11432
- HoursMon–Fri · 8:00 AM – 6:00 PM · Weekend by appointment